The organization has planned a route with low/medium difficulty, composed of some more demanding sections of very varied ground, which have features to be transposed without significant difficulties. This is expedition with a long-distance to go (about 5.500 kilometers) with 55% of asphalt and 45% of off-road. The entire route will be covered in a few weeks recognition before expedition start.
- Stage 1: 27/12/2025: Portugal – Tarifa
- Stage 2: 28/12/2025: Tarifa – Meknes
- Stage 3: 29/12/2025: Meknes – Merzouga
- Stage 4: 30/12/2025: Merzouga – Mhamid
- Stage 5: 31/12/2025: Mhamid – Icht
- Stage 6: 1/1/2026: Icht – Abeth Camp
- Stage 7: 2/1/2026: Abeth Camp – Boudjour
- Stage 8: 3/1/2026: Boudjour – Dahkla
- Stage 9: 4/1/2026: Dahkla- Boulanouar Camp
- Stage 10: 5/1/2026: Boulanouar Camp – Azougui
- Stage 11: 6/1/2026: Azougui- Ouadane – Azougui
- Stage 12: 7/1/2026: Azougui – Benichab Camp
- Stage 13: 8/1/2026: Benichab Camp – Nouakchott
- Stage 14: 9/1/2026: Nouakchott – St.Louis
- Stage 15: 10/1/2026: St.Louis – Dakar
